Energy News

In South-East Europe, the next wave of renewable buildout is being shaped as much by transmission constraints as by wind resources, solar irradiation, or battery performance. Developers are increasingly finding that where a project connects to the 400 kV network can determine whether it earns stable capture prices or faces curtailment and volatility. As a result, grid modernization and technical studies are moving from “background” work to core investment planning.

Serbia’s 400 kV backbone as a market-shaping asset Serbia sits at the centre of the region’s power flows, with EMS

Scroll to Top